SciELO - Scientific Electronic Library Online

 
vol.1 número6Estudio bioecologico de base del pez doradito (oligosarcus bolivianus), para su cultivo en cau índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

    Links relacionados

    • Não possue artigos citadosCitado por SciELO
    • Não possue artigos similaresSimilares em SciELO

    Bookmark

    Revista Ventana Cientifica

    versão impressa ISSN 2305-6010

    Resumo

    MAMAUI TOLA, Ariel Ramiro. Implementation of management system research projects (G Project). Rev. Vent. Cient. [online]. 2013, vol.1, n.6, pp. 2-10. ISSN 2305-6010.

    The constant development of computer science in regard to trie growing of Information systems has resultad in a number of paradigms that allow the achievement of high quality Informaties solutions. Despite of the current techniques and technology used for developing an Information system, this is meaningless if it does not correspond to an analysis and design that solves a specific problem and problem domain sultable for its automation. The development of information systems is a process that follows varlous stages at which varlous tasks are performed.lf these are well developed, they assure that the final product is a real solution to the problem. This article describes the most important aspects of the implementation of an Information systemto solve the problem of the management of reeearch projects at the DICVT Department where the identified problem domain offers the possibility of ralsing an IT solution through an information system that allows information to manage research projects automatically, also offering the abllity to make academic and financial monitoring of research projects and providing timely statistical Information. The necessary analysis piocesses and engineering requliements are detalled in the design stage, the MWM architectural pattern was used; the Frameworks and the APIs used are described in the development stage, Finally, the technology used in the implementation stage is specifled

    Palavras-chave : Information System; Java; MWM; Project Management; DICYT.

            · resumo em espanhol     · texto em espanhol     · pdf em espanhol